| Spenglerei Siemens – VAI Linz

0000_SPL_01

Site
Stahlstraße 42, 4031 Linz

Masterplan Workshop
2006-2011

Completion Metal Shop
2007

Gross Floor Area
1.916 m2

Building Footprint
1.458 m2

Budget
1,2 Million EUR 

Partner-in-Charge
Architect Christian Aulinger

Client
Siemens-VAI / Linz 

Consultants
Structural Engineer – Reinhard Schneider / Vienna

General Contractor
Alpine Bau

Metalwork
Fil Metallbau / Hohenzell

Photos
©2007 Christian Aulinger

0000_SPL_04

Based upon a master plan for the expansion and modernization of the in-house workshops of Siemans-VAI in Linz, Austria, the existing workshops (metal working, sheet metalworking, carpentry, cabinetry, paint shop and glaziers) are to be demolished step-by-step and replaced with newly built, modern facilities. The master plan includes the provisional logistics infrastructure necessary for the uninterrupted continuation of operations during construction.